PayStream Solutions, Inc. processes payroll transactions for retail companies. Retailers and their financial statement auditors use PayStream's controls when evaluating internal control over financial reporting. A CPA firm is completing an examination of PayStream's system for the period January 1 through December 31. Using the exhibits, determine the appropriate engagement classification, evaluate the evidence concerning logical access provisioning controls, and document the reporting consequence.
Show answer and rationale
Rationale
PayStream’s examination is a restricted-use SOC 1 Type 2 engagement covering controls relevant to user retailers’ financial reporting throughout the year.
- The Engagement Request calls for conclusions on both design and operating effectiveness from January 1 through December 31, for management, user retailers, and user auditors with sufficient understanding.
- The System Description Excerpt and Completion Memorandum establish that the description is fairly presented and Controls A-1 and A-2 were suitably designed.
Observed control deviations and an unresolved scope limitation require different conclusions.
- The Service Auditor’s Testing Workpaper shows that 18 of 60 sampled grants lacked timely retrospective approval, a 30% observed deviation rate; Control A-2 therefore did not operate effectively throughout the period.
- Because management refused the additional procedures described in the Completion Memorandum, the auditor lacks sufficient appropriate evidence about achievement of the control objective; the possible effects are material and pervasive, requiring a disclaimer of opinion.
Traps in this case
Treating the January walkthrough as a period test
- Tracing one standard request supports implementation in January, not operating effectiveness throughout the year.
Treating IT-lead authorization as sufficient for emergency access
- Control A-2 also requires documented authorized-manager approval within 24 hours, which the 18 grants lacked.
Issuing an adverse opinion based solely on the deviations
- The Completion Memorandum identifies an unresolved, material and pervasive scope limitation concerning the control objective, so the reporting consequence is a disclaimer.