Approval attributes and sampling risk
An auditor tests 100 purchase orders for required approval.
Two purchase orders lack approval.
The tolerable deviation rate is 5%, and the selected sampling risk is 5%.
The resulting upper deviation rate is 6.2%.
The common answer is to accept the control because the observed rate is 2%, below 5%, but that ignores sampling risk.
The approval mark is an attribute because it is present or absent. The rule moves from that count to a conclusion about the whole population.
Six criteria for attribute sampling
AU-C 530 requires all criteria in sequence, not any one criterion alone. The sequence protects the sample and the conclusion.
- When designing an audit sample, consider the purpose of the audit procedure and the characteristics of the population.
- Determine a sample size sufficient to reduce sampling risk to an acceptably low level.
- Select items so that each sampling unit in the population has a chance of selection.
- Perform audit procedures appropriate to the purpose on each selected item.
- Investigate the nature and cause of any deviations and evaluate their possible effect.
- Evaluate the sample results and whether sampling provided a reasonable basis for conclusions about the population.
🔑 RULE: Compare the upper deviation rate with the tolerable deviation rate. Planned reliance is supported only when the upper rate is at or below the tolerable rate.
Tolerable deviation rate is the highest control-deviation rate accepted without changing planned reliance. Observed deviation rate equals deviations divided by items tested. Sampling risk is the risk that the sample conclusion differs from the whole-population conclusion.
Use the planned statistical method to calculate an upper deviation rate. A 5% sampling risk represents a 95% confidence level in this case. It is a case choice, not a universal threshold.
- If the upper deviation rate is at or below the tolerable rate, planned reliance is supported.
- If the upper deviation rate is above the tolerable rate, planned reliance is not supported.
The standards require a reasonable basis, not just a low count. The upper rate controls the final decision because it allows for sampling risk.
Upper deviation rate supports reliance
The path first protects sample quality. It then measures deviations and allows for sampling risk before the reliance decision.
Loading diagram…
The no branch ends planned reliance, not all audit work. Variables sampling and sample size addresses numeric misstatements and variables-sampling sample-size decisions.
Two deviations, 6.2% upper rate
The table applies each fact to the sampling sequence. The final row compares the upper deviation rate with the tolerable rate.
| Fact | Criterion it touches | Met or not met |
|---|---|---|
| The population is 2,000 purchase orders, and the attribute is required approval on each order. | Purpose, population, and sampling unit | Met |
| The auditor randomly selects 100 orders, so each purchase order has a chance of selection. | Selection criterion | Met |
| Two of the 100 orders lack approval, giving an observed deviation rate of 2%. | Perform procedures and count deviations | Met |
| The auditor investigates the two missing approvals and sets a 5% tolerable deviation rate. | Investigation and tolerable-rate criterion | Met |
| With 5% sampling risk, the selected one-sided exact method gives a 6.2% upper deviation rate. | Sampling-risk evaluation | Met |
| The upper deviation rate of 6.2% is above the 5% tolerable rate. Verdict: do not rely on the approval control as planned. | Final comparison and reasonable basis | Not met |
The wrong answer came from comparing the 2% observed rate with 5% and skipping the upper-rate allowance for sampling risk.
The observed rate is only the sample result. The upper rate exceeds tolerable rate, so planned reliance is not supported.
Zero deviations still leave sampling risk
The table holds the facts constant while separating zero observed deviations from the remaining sampling risk.
| Fact | Criterion it touches | Verdict |
|---|---|---|
| The attribute is required approval on each purchase order. | Purpose and sampling unit | |
| The auditor randomly selects 100 purchase orders from the population. | Each unit has a chance of selection | |
| No selected purchase order lacks approval. | Observed deviation rate | |
| The tolerable deviation rate is 5%, and acceptable sampling risk is 5%. | Tolerable rate and sampling risk | |
| The one-sided exact upper deviation rate is 3.0%. | Upper-rate comparison | ? |
Zero observed deviations still leave sampling risk. The upper rate is 3.0% rather than zero.
Practice
Based on the table, what is the appropriate conclusion?
Sampling risk, rates, selection and size
These questions apply the same sequence to risk definitions, rate comparisons, selection, and sample-size judgments.
Practice
In a test of an approval control, what is sampling risk of incorrect acceptance?
A sample of 100 purchase orders has two deviations, a 2% observed deviation rate, a 5% tolerable deviation rate, and a 6.2% upper deviation rate at 5% sampling risk. What is the conclusion?
Which selection method best meets the requirement that each sampling unit have a chance of selection?
Holding expected population deviation rate and desired assurance constant, which change generally increases the required sample size?
A higher tolerable rate supports reliance
Was: From a population of 2,000 purchase orders, the auditor randomly selected 100, found two missing approvals, calculated a 2% observed deviation rate and a 6.2% upper deviation rate at 5% sampling risk, and compared it with a 5% tolerable deviation rate.
Now: Management's tolerable deviation rate is 7%; does the verdict change?
Answer: Yes. The tolerable deviation rate moved from 5% to 7%. The 6.2% upper deviation rate is now at or below tolerable rate, so planned reliance is supported.
The sample facts and sampling risk did not move. Only the tolerable-rate criterion moved, reversing the final comparison.
Attribute sampling criteria and rate comparisons
Purpose and population: define the control attribute and sampling unit.
Sample size: choose enough items to reduce sampling risk to an acceptably low level.
Selection: give each sampling unit a chance of selection.
Testing: perform the procedure on every selected item.
Investigation: determine the nature and cause of deviations.
Tolerable deviation rate: the highest rate accepted without changing planned reliance.
Observed deviation rate: deviations divided by items tested.
Upper deviation rate: the rate that allows for sampling risk under the selected method.
Combining rule: apply all criteria in sequence, then support planned reliance only when the upper deviation rate is at or below the tolerable deviation rate.
The criterion people skip: they compare the observed rate with tolerable rate and fail to calculate or consider the upper rate for sampling risk.
The full sequence protects both the sample and the conclusion. Variables sampling and sample size handles the separate numeric-sampling setting.
Unlock the full lesson and continue reading
Signup to continue reading this lesson and unlimited access questions, flashcards, AI notes, and more

