Verifying processes and processing integrity

Verifying processes and processing integrity

Published September 28, 2026

Verifying processes and processing integrity

On this page

Reconciling actual processing to approved documents

ERP and accounting systems and Risks of new technology and process change supply the system and change-risk context. These rules compare approved documents with evidence before judging controls.

  • An ERP integrates business processes and shared data. An accounting information system captures, processes, and reports transaction data. Use these roles to identify records that should agree.
  • An automated or changed step can create a new risk or leave approved documentation stale. Compare the performed step and its control with the approved design.
  • The actual process must agree with its flowcharts, diagrams, and narratives. Name and resolve every difference.
  • Processing integrity means system processing is complete, valid, accurate, timely, and authorized.
  • AICPA Trust Services Criterion PI1.2 requires policies and procedures over system inputs.
  • AICPA Trust Services Criterion PI1.3 requires policies and procedures over system processing.
  • AICPA Trust Services Criterion PI1.4 requires policies and procedures over system outputs.

Northstar's March 2025 review is chapter 3 of 3 and takes 35 minutes. A new automatic retry runs at 23:30, but the approved flowchart ends at 23:00. Is this a documentation mismatch, a processing control issue, or both?

Comparing documented and actual process steps

Process pointNarrative on prepared sheetFlowchart box on prepared sheetActual evidence
Input checksCredit check, then validate customer ID, item, and quantityCredit check → input validationInput validation at 08:00; credit check at 08:01
ApprovalManager approval required when order total is greater than $5,000Manager approval required for every orderIn a 40-order trace, 24 orders at or below $5,000 had no approval; 16 orders above $5,000 had approval
General-ledger postingOne nightly batch at 23:00One nightly batch at 23:00Normal batch at 23:00; automatic retry at 23:30 for failed rows
Exception reportController reviews the report every dayController reviews the report every daySign-off is present for 28 of 30 report dates; the prepared status says complete
Source recordDetail
Input-control test40 orders tested; 37 had complete customer ID, item, and quantity; 3 orders missing customer ID were accepted
Invoice register100 invoice records totaling $218,000
General-ledger batch101 invoice records totaling $220,000; invoice INV-1044 appears twice, and the duplicate is $2,000
Exception-report log30 report dates; 28 signed reviews; March 12 and March 25 have no sign-off

Separating documentation mismatches from control deficiencies

A documentation mismatch is not automatically a processing-integrity deficiency. A control that accepts invalid input, posts an incorrect duplicate, or lacks required output review is a control exception under the applicable PI criterion.

Problem and locationCorrect figure or treatmentRule that says soError tag
The input sequence in the narrative and flowchart is reversed. The event log shows validation at 08:00 and credit check at 08:01.Change both documents to show input validation before the credit check. Retain the event log as evidence.Actual steps must reconcile to narratives and flowcharts.cross-document reconciliation
The flowchart applies manager approval to every order. The narrative requires it only above $5,000.Require approval only above $5,000. The 24 orders at or below $5,000 do not need approval. The 16 orders above $5,000 do.Use the approved process rule when reconciling the process to the diagram.rule selection
The narrative and flowchart omit the automatic retry at 23:30.Add the retry as a performed step. Document duplicate prevention or reconciliation before reposting.An automated process change can introduce risk or make documentation stale.fact extraction
The prepared PI1.2 conclusion says 40 of 40 input tests passed. Three orders missing customer ID were accepted.Report 37 passing tests and 3 exceptions. Record a PI1.2 control exception.PI1.2 requires policies and procedures over system inputs.response entry
The prepared PI1.3 conclusion says 100 records and $218,000 agree. The batch has 101 records and $220,000.Remove or correct duplicate INV-1044. Reconcile 101 records and $220,000 to 100 records and $218,000.PI1.3 requires policies and procedures over system processing.calculation
The prepared PI1.4 conclusion says daily output review is complete. Only 28 of 30 dates have sign-off.Report 28 completed reviews and 2 missing reviews. The missing dates are March 12 and March 25.PI1.4 requires policies and procedures over system outputs.response entry

The first three rows repair process descriptions. The last three rows show PI1.2, PI1.3, and PI1.4 control exceptions.

Reconciling process evidence and accounting differences

The smaller worksheet contains three planted errors.

RecordPrepared process or control statementEvidence excerpt
Input sequenceThe flowchart shows input validation after the credit checkEvent log: input validation at 08:00; credit check at 08:01
GL tie-outThe batch agrees with the invoice register at 100 records and $218,000Invoice register: 100 records and $218,000; GL log: 101 records and $220,000, including duplicate INV-1044
Output reviewDaily controller review is complete for 30 of 30 datesSign-off log: 28 signed dates; March 12 and March 25 are blank

Keep the invoice register at $218,000, but suppose the GL has 99 records totaling $216,000 because one $2,000 invoice was omitted. What signed adjustment reconciles the GL to the register?

Practice

The worksheet says the flowchart places input validation after the credit check. The event log shows input validation at 08:00 and the credit check at 08:01. Which item should be changed?

Change one fact: the GL contains 99 records totaling $216,000 because one $2,000 invoice was omitted. Using the invoice register as the base, what signed adjustment reconciles the GL amount to the register?

Two daily controller sign-offs are missing, but the invoice and GL data agree after the duplicate is removed. What is required for the missing sign-offs?

Comparing process order, totals and evidence

  • Compare the performed order with every narrative, flowchart, and diagram. Do not let one matching document hide another mismatch.
  • Reconcile both counts and amounts. Trace each unexplained difference to a specific input or processing event.
  • Enter a control exception when required evidence is missing. Record a journal entry only when an accounting error is identified.

Unlock the full lesson and continue reading

Signup to continue reading this lesson and unlimited access questions, flashcards, AI notes, and more

Scan to download app

Scan to download
UNLOCK FREE ACCESS

Practice Questions: Verifying processes and processing integrity

  1. 1. A sales subledger transmits a summarized revenue journal entry to the general ledger each night. Management is concerned that an entire transmission could be omitted or processed twice even though each individual sales record is valid. Which control would most directly detect either condition?

    • A. Review user access to the sales subledger each quarter.
    • B. Reject sales records containing invalid customer identifiers.
    • C. Verify the numerical sequence of invoices within each sales batch.
    • D. Compare source record counts and dollar control totals with accepted interface and posted general-ledger totals.
    Show answer

    Answer: D. Compare source record counts and dollar control totals with accepted interface and posted general-ledger totals.

    Compare source record counts and dollar control totals with accepted interface and posted general-ledger totals. - Comparing source counts and dollar totals with accepted interface and posted general-ledger totals detects a nightly transmission omitted between those stages. - A transmission processed twice creates a mismatch in counts or dollar totals even when every individual sales record is valid. Review user access to the sales subledger each quarter. - Quarterly access reviews address who can use the subledger, not whether its nightly revenue entry reached the general ledger. - They do not reconcile transmissions and therefore would not directly detect a duplicate posting. Reject sales records containing invalid customer identifiers. - This checks record validity, but the concern assumes each individual sales record is valid. - Rejecting invalid identifiers would not reveal that an entire valid transmission was omitted or processed twice. Verify the numerical sequence of invoices within each sales batch. - Sequence checks can identify missing invoices within a batch, not whether the summarized entry was transmitted and posted. - A complete batch can pass its sequence check even if its transmission is omitted or duplicated.

  2. 2. In an integrated ERP system, sales representatives may request changes to customer credit limits. The system currently permits a sales representative to enter a requested limit and immediately makes that amount effective. Which control would most directly reduce the risk of unauthorized credit-limit increases?

    • A. Reconcile the accounts receivable subsidiary ledger to the general ledger each day
    • B. Review monthly sales by representative for unexpected fluctuations
    • C. Require multifactor authentication when representatives enter sales orders
    • D. Route credit-limit changes to a credit manager for approval before activation
    Show answer

    Answer: D. Route credit-limit changes to a credit manager for approval before activation

    Route credit-limit changes to a credit manager for approval before activation - Requiring credit manager approval prevents a sales representative’s requested limit from becoming effective without authorization. - The approval must occur before activation because the ERP system currently makes the representative’s entry effective immediately. Reconcile the accounts receivable subsidiary ledger to the general ledger each day - This reconciliation checks whether receivable balances agree; it does not control changes to customer credit-limit data. - An unauthorized limit increase could remain effective even if the subsidiary ledger and general ledger reconcile. Review monthly sales by representative for unexpected fluctuations - A monthly review might detect unusual sales patterns, but it does not require approval of a credit-limit increase. - By the time a fluctuation appears in the review, the requested limit may already have been used. Require multifactor authentication when representatives enter sales orders - Multifactor authentication verifies the representative’s identity when entering sales orders, not authority to approve credit-limit changes. - An authenticated representative could still make a requested limit effective under the current ERP process.

Flashcards: Verifying processes and processing integrity

  1. 1. When are exception reports generated?

    Show answer

    Exception reports are generated when transactions or conditions meet predefined exception criteria, such as falling outside specified parameters and requiring review. Edit tests, check digits, and self-checking digits are validation controls, not the defining trigger for an exception report.

  2. 2. Explain end-user computing.

    Show answer

    End-user computing allows users to develop and run their own applications.

  3. 3. What is the function of a check digit in data entry?

    Show answer

    A check digit is an additional digit, often appended to a number, that helps detect certain data-entry or transcription errors; it does not prove that the entire number is accurate.

  4. 4. What advantages does electronic data interchange offer?

    Show answer

    EDI employs widely accepted standards and enhances efficiency.

  5. 5. What is a hash total, and how is it used in input controls?

    Show answer

    A hash total is a sum of nonfinancial data values, such as account or employee numbers, calculated before processing and recomputed afterward to detect missing or altered input records.

  6. 6. List the risks associated with e-commerce.

    Show answer

    - Data breaches or theft - Reduced paper trail for auditing

  7. 7. What system-programming activity should a system operator avoid?

    Show answer

    For internal control integrity, a system operator should not engage in system programming.

  8. 8. What features define an Executive Information System (EIS)?

    Show answer

    An EIS is tailored to executive needs and provides summarized information and analytical tools to support strategic planning and executive decision-making. It supports decisions but does not make them autonomously.

Everything you need for CPA prep

Get full Oncourse access with lessons, practice questions, flashcards and AI study tools.

GET STARTED FOR FREE
75% OFFLimited time offer
GET 75% OFF