Availability criteria and recovery evidence
The recovery and backup chapters supply the facts. The availability criteria identify where each fact belongs.
- Continuity planning and impact analysis: A business impact analysis identifies process impacts, priorities, and recovery objectives. A business continuity plan sustains operations. A disaster recovery plan restores systems. Compare recovery evidence with approved recovery objectives.
- Backups, mirroring and replication: A full backup copies all selected data. An incremental backup copies changes since the last backup of any type. A differential backup copies changes since the last full backup. Mirroring and replication keep another available copy, but the method alone does not prove that the control worked.
- SOC 2 Availability A1.1: The entity maintains, monitors, and evaluates current processing capacity and use of system components to manage capacity demands and meet availability commitments and system requirements.
- SOC 2 Availability A1.2: The entity authorizes, designs, develops, implements, operates, maintains, and monitors environmental protections, software, data backup processes, and recovery infrastructure to meet availability commitments and system requirements.
- SOC 2 Availability A1.3: The entity tests recovery plan procedures supporting system recovery to meet availability commitments and system requirements.
- SOC 2 does not set a universal numeric capacity, backup-success, recovery-time, or data-loss threshold. Use the service commitment, approved recovery objectives, and the entity's own policies. A1.3 also does not require a universal annual or semiannual test interval.
The prepared entries and the source records are deliberately shown together without a conclusion about which one is right.
Capacity, backup and recovery results
Prepared by Northstar Cloud Services management for the SOC 2 engagement; it does not tie to the supporting records.
| Availability control testing schedule | Criterion | Evidence entered | Result |
|---|---|---|---|
| Capacity monitoring | A1.1 | Peak CPU: 72%; alert threshold: 80% | Pass |
| Backup process | A1.2 | 100 scheduled; 96 successful; success rate: 100%; failed jobs escalated: Yes | Pass |
| Recovery testing | A1.2 | Restore time: 4 hours; data loss: 1 hour | Pass |
| Overall conclusion | A1.1-A1.3 | Exceptions: 0 | No exceptions |
| Supporting record | Fact |
|---|---|
| SLA and approved BIA | Availability commitment: 99.9% per month; RTO: 4 hours; RPO: 1 hour |
| Capacity policy and August dashboard | Investigate and open a capacity action ticket when peak CPU exceeds 80%; August peak CPU was 92%; no capacity action ticket was opened |
| Backup policy and backup log | 100 jobs were scheduled; 96 completed; 4 failed; no failed job was rerun or reviewed within 1 business day |
| Recovery test record dated June 30, 20X5 | The recovery procedure restored service in 6 hours and had 2 hours of data loss |
| Approved recovery objectives | Restore service within 4 hours and limit data loss to 1 hour |
Correct figures, criteria and conclusions
The reviewer checks both the number entered and the conclusion drawn from it. A wrong number differs from choosing the wrong criterion, failing to report an exception, or allowing the summary to disagree with detailed testing.
| Problem | Location | Correct figure or treatment | Rule (chapter) | Error tag |
|---|---|---|---|---|
| Peak CPU was entered as 72% instead of 92%, so the threshold breach was hidden. | Capacity monitoring, evidence entered | Enter 92% and report an exception because the 80% policy threshold was exceeded and no action ticket was opened. | SOC 2 A1.1; Evaluating availability controls | fact extraction |
| The backup success rate was entered as 100% even though 96 of 100 jobs completed. | Backup process, success rate | Enter 96%, calculated as 96 divided by 100; four jobs failed. | SOC 2 A1.2; Backups, mirroring and replication | calculation |
| The workpaper says failed jobs were escalated, but the source record shows no rerun or review within 1 business day. | Backup process, escalation response | Report an A1.2 exception for the four failed jobs that were not handled under the backup policy. | SOC 2 A1.2; Backups, mirroring and replication | response entry |
| The recovery test was assigned to A1.2, which covers backup and recovery infrastructure rather than testing recovery procedures. | Recovery testing, criterion column | Assign the recovery test to A1.3. | SOC 2 A1.3; Evaluating availability controls | rule selection |
| The recovery result was entered as 4 hours and 1 hour instead of the observed 6 hours and 2 hours. | Recovery testing, evidence entered | Enter 6-hour restore time and 2 hours of data loss. Report an exception because both approved objectives were missed. | SOC 2 A1.3; Continuity planning and impact analysis | fact extraction |
| The summary says there were no exceptions even though the detailed rows contain capacity, backup, and recovery exceptions. | Overall conclusion | Report 3 exceptions in the summary. | SOC 2 A1.1-A1.3; Evaluating availability controls | cross-document reconciliation |
The fixes separate source-reading errors from control deficiencies and reporting errors. The smaller workpaper changes the facts while keeping that review method.
Storage, backup and recovery results
The second workpaper changes the facts, not the review rules. Review storage, the 12-job sample, and the recovery test against the supporting records.
Prepared by Northstar Cloud Services management for a follow-up SOC 2 review; it does not tie to the supporting records.
| Availability control testing schedule | Criterion | Evidence entered | Result |
|---|---|---|---|
| Capacity monitoring | A1.1 | Peak storage: 68%; alert threshold: 75% | Pass |
| Backup process | A1.2 | 12 scheduled; 11 successful; failed job escalated: Yes | Pass |
| Recovery testing | A1.3 | Restore time: 3 hours; data loss: 1 hour | Pass |
| Supporting record | Fact |
|---|---|
| Capacity policy and dashboard | Investigate and open a capacity action ticket when peak storage exceeds 75%; peak storage was 88%; no ticket was opened |
| Backup policy and log | 12 jobs were scheduled; 11 completed; 1 failed; the failed job was not rerun or reviewed within 1 business day |
| Recovery test record dated September 30, 20X5 | Service restoration took 5 hours; data loss was 1 hour; approved RTO was 4 hours and approved RPO was 1 hour |
The second record tests criterion selection, the pass or exception status, and whether the failed backup requires an entry.
Practice
The source facts show peak storage of 88% against a 75% alert threshold, with no capacity action ticket. Which side of the availability review should receive the exception?
The recovery test restored service in 5 hours and had 1 hour of data loss against an approved RTO of 4 hours and RPO of 1 hour. Which sign should be entered for the recovery test?
The backup record shows 1 failed job and no rerun or review within 1 business day. Is an exception entry needed?
Match facts, criteria and exceptions
- Start with the source fact, not the prepared conclusion; a copied figure can hide the exception.
- Match each fact to A1.1, A1.2, or A1.3, then compare it with the entity's commitment or policy.
- Carry every exception into the report summary; passing one measure does not erase a miss on another.