Learning Outcome Statement
Demonstrate how currency swaps, forwards, and futures can be used to modify a portfolio’s risk and return.
On the exam: The question gives portfolio currency exposure, quote orientation, contract terms, and settlement assumptions. You select and justify the swap, forward, or futures position, then calculate or explain payoff, value, profit, and residual risk.
Your portfolio can earn a return on a foreign asset and still lose in home-currency terms when the foreign currency falls. As a USD investor with long EUR exposure, you benefit from EUR strength and suffer from EUR weakness. A short EUR forward or short EUR futures position offsets that currency move, while a currency swap can transform recurring EUR cash flows into USD cash flows.
| Instrument | Position for long EUR | Terms to state |
|---|---|---|
| Forward | Short EUR forward | Notional, maturity, rate, no premium, physical settlement |
| Futures | Short EUR futures | Standardized notional, maturity, margin, daily settlement |
| Currency swap | Receive USD, pay EUR | Payer or receiver, currencies, notionals, maturity |
Select the instrument from the cash-flow problem, not the asset label. A short hedge narrows currency sensitivity, but it also gives up part of the USD gain when EUR strengthens.
For a USD-per-EUR quote, a short EUR forward commits you to deliver EUR and receive USD at the contracted rate. The EUR notional is $N$, and the contracted forward rate in USD per EUR is $K$. At maturity $T$, the spot rate is $S_T$.
$$ \text{Short EUR forward payoff at }T = N \times (K-S_T) $$
At maturity, the short receives $K$ USD per EUR delivered and gives up $S_T$ at market. A weaker EUR makes payoff positive; a stronger EUR makes it negative. This is terminal payoff, not pre-maturity value or total profit. With no upfront premium, inception value is USD 0.00.
Choose the hedge after identifying exposure and quote direction.
Loading diagram…
Futures use standardized EUR contract terms and daily settlement through margin. A short futures position can offset EUR weakness, but contract size, maturity, basis, and settlement timing may leave residual risk.
A currency swap changes a stream rather than a single delivery. To convert EUR cash flows into USD cash flows, state that you receive USD interest and pay EUR interest. State the USD notional, EUR notional, and maturity. Principal is exchanged at inception, interest during the term, and principal is reversed at maturity.
| Phase | Cash flow | Contract action |
|---|---|---|
| Inception | Receive USD principal, pay EUR principal | Exchange principal |
| Term | Receive USD interest, pay EUR interest | Exchange interest |
| Maturity | Pay USD principal, receive EUR principal | Reverse principal |
Read the phases as a sequence of obligations. At inception, the investor receives USD and gives up EUR principal; during the term, the same currency directions apply to interest. At maturity, the principal directions reverse. Naming both sides prevents a vague answer such as “use a swap” from hiding which cash flows actually become dollars.
Worked example
You are a USD investor holding a foreign asset. Call the EUR forward notional $N$, initial spot $S_0$, and contracted rate $K$. At maturity $T$, the foreign asset is worth $V_T$ EUR and spot is $S_T$ USD per EUR. Compare leaving the asset unhedged with selling EUR forward. Keep the quote in USD per EUR throughout: multiplying EUR by this rate gives USD, while the forward contract locks the rate only on its stated notional. Any asset value beyond that notional remains exposed to terminal spot.
| Input | Value |
|---|---|
| Portfolio exposure | Long EUR asset |
| Initial EUR exposure | EUR 10,000,000 |
| Forward notional, $N$ | EUR 10,000,000 |
| Initial spot, $S_0$ | 1.1 USD per EUR |
| Forward rate, $K$ | 1.095 USD per EUR |
| Terminal EUR value, $V_T$ | EUR 10,200,000 |
| Terminal spot, $S_T$ | 1.06 USD per EUR |
| Maturity, $T$ | 0.25 years |
| Settlement | Physical at maturity |
| Premium | No upfront premium |
The inputs fix the exposure and contract before you calculate. The asset grows from EUR 10,000,000 to EUR 10,200,000, but the forward covers only EUR 10,000,000. The opening spot establishes the USD profit baseline; the contracted rate determines locked proceeds, and terminal spot translates both the unhedged asset and the residual EUR. Settlement and premium assumptions determine which cash flows belong in the comparison.
Loading diagram…
Read the chart and values together by tracking the slope of each line. Unhedged value rises sharply with EUR/USD because the entire asset is converted at spot. Hedged value changes much less: most EUR proceeds are locked at 1.095, while EUR 200,000 remains exposed. The rows quantify that pattern at three terminal quotes; they are terminal values, so do not call them profits until you subtract the initial USD value.
| Terminal spot | Unhedged value | Hedged value |
|---|---|---|
| USD per EUR 0.96 | USD 9,792,000.00 | USD 11,142,000.00 |
| USD per EUR 1.06 | USD 10,812,000.00 | USD 11,162,000.00 |
| USD per EUR 1.16 | USD 11,832,000.00 | USD 11,182,000.00 |
- Translate the opening EUR exposure to USD so later profit has a home-currency base. The calculation is $10,000,000 \times 1.1 = 11,000,000.00$, producing an initial USD value of USD 11,000,000.00.
- Find the EUR left after physical delivery. The residual is $10,200,000 - 10,000,000 = 200,000.00$ EUR.
- Apply the short position's delivery obligation using the stated physical settlement and no upfront premium. The payoff is $10,000,000 \times (1.095 - 1.06) = 350,000.00$ USD.
- Translate the whole asset without a hedge. The terminal value is $10,200,000 \times 1.06 = 10,812,000.00$ USD.
- Combine locked proceeds with residual EUR at spot. The hedged terminal value is $10,000,000 \times 1.095 + 200,000 \times 1.06 = 11,162,000.00$ USD.
- Separate profit from terminal value by subtracting the opening USD value. Unhedged profit is $10,812,000.00 - 11,000,000.00 = -188,000.00$ USD. Hedged profit is $11,162,000.00 - 11,000,000.00 = 162,000.00$ USD.
The hedge changes the result from USD -188,000.00 to USD 162,000.00, while EUR 200,000.00 remains unhedged. The mandate is to reduce currency risk without pretending the foreign asset's own return has disappeared.
Changed condition
Keep the exposure, notional, rate, maturity, and settlement fixed. Change only terminal spot from 1.06 to 1.14 USD per EUR, which makes EUR stronger.
| Measure | Base, $S_T = 1.06$ | Spot-up, $S_T = 1.14$ |
|---|---|---|
| Short forward payoff | USD 350,000.00 | USD -450,000.00 |
| Unhedged profit | USD -188,000.00 | USD 628,000.00 |
| Hedged profit | USD 162,000.00 | USD 178,000.00 |
Predict the signs: a higher quote lowers the short payoff from USD 350,000.00 to USD -450,000.00, while unhedged profit rises from USD -188,000.00 to USD 628,000.00. Hedged profit moves only to USD 178,000.00 because EUR 200,000.00 remains exposed. Recompute the spot-up terminal values and profits.
Common error
Going long may seem to match a long foreign asset, but it adds EUR exposure. A USD investor with long EUR exposure sells EUR forward, or uses short EUR futures, to offset currency weakness.
Calculator
Key the notional, forward rate, and terminal spot before computing the base payoff. The sequence follows the payoff expression: clear the worksheet, enter the EUR notional, then enter the contracted rate and maturity spot. The calculator returns the short position’s USD payoff, not the portfolio’s total profit. Compare that result with the hand calculation before moving to the changed quote.
| Keys | Display |
|---|---|
| 2ND CLR WORK | 0.00 |
| 10,000,000 ENTER | 10,000,000.00 |
| 1.095 ENTER | 1.095 |
| 1.06 ENTER | 1.06 |
| CPT payoff | 350,000.00 |
For the sensitivity case, keep the notional and contracted rate unchanged and replace only terminal spot with 1.14. This isolates the effect of EUR strengthening: the short forward payoff changes sign because the market rate is now above the rate at which you agreed to sell EUR. The display can be checked directly against the changed-condition row above.
| Keys | Display |
|---|---|
| 2ND CLR WORK | 0.00 |
| 10,000,000 ENTER | 10,000,000.00 |
| 1.095 ENTER | 1.095 |
| 1.14 ENTER | 1.14 |
| CPT payoff | -450,000.00 |
Go deeper
Before maturity, value a forward by its replacement cost today, not its terminal payoff. For a short EUR forward, compare locked rate $K$ with current USD-per-EUR forward rate $F_t(T)$ and discount the USD difference using $\mathrm{DF}_{\mathrm{USD}}(t,T)$. The value is negative when $K$ is below $F_t(T)$:
$$ V_t^{\text{short}} = N \times (K-F_t(T)) \times \mathrm{DF}_{\mathrm{USD}}(t,T) $$
This is contract value at $t$, not terminal payoff or total profit. Record any premium at its payment date and portfolio carry at its cash-flow dates. The example has no upfront premium.
Futures settle daily through margin. Though both futures and forwards lock an exchange price, standardized terms, margin cash flows, basis, and settlement differences can leave a mismatch. For recurring flows, a swap may fit better; state payer or receiver and when principal reverses.
Check yourself
Practice
Which statement best describes a short EUR futures hedge for a USD investor with long EUR exposure?
demonstrate
Demonstrate the instrument choice and cash-flow direction when recurring EUR cash flows must become USD cash flows.
Revision snapshot
Identify exposure before choosing the hedge. Long foreign currency generally calls for a short foreign-currency forward or futures position. For a USD-per-EUR quote, a short EUR forward payoff at maturity is $N \times (K-S_T)$ from the hedger's perspective. A currency swap exchanges principal, exchanges interest payments, and reverses principal exchange, so state payer or receiver, currencies, notional, and maturity. Separate forward value before maturity, terminal payoff, and total portfolio profit. Include premium timing and carry. Futures use daily settlement and standardized terms, so basis, margin, and settlement differences can leave residual risk. Do not go long simply because the portfolio is long EUR. On the exam, justify the position from the exposure and quote orientation.
Unlock the full lesson and continue reading
Signup to continue reading this lesson and unlimited access questions, flashcards, AI notes, and more